post

GSLV MKII F10

  • Description
  • Download

GSLV MkII F10 launched on Aug 12, 2021 but failed 10 minutes after liftoff due to low tank pressure of the Cryogenic upper stage engine.


Launch Site: SDSC SHAR Sriharikota, India (Second Launch Pad)


Vehicle: GSLV MkII (Uprated Cryogenic engine CUS15), first flight of a 4 meter diameter ogive payload fairing.


Payload: GSAT-1 ( EOS-03) satellite


1:96 Scale Model


Use Second launch pedestal for display