The site for Space Shuttle Card Modelers
© 2010
   

 

 

 

STS-129 Payload / ULF-3

Space Shuttle Atlantis was launched on Nov 16, 2009 on its penultimate voyage on a mission to the ISS carrying the first two Express Logistics Carriers with multiple ORU's (Orbital Replacement Units). These carriers are the ELC-1 and ELC-2, which occupied most of the payload bay and were left at the ISS for an extended duration.

ELC-1: The top deck consists of a Control Moment Gyro (CMG), Latching End Effector (LEE), Battery Charge/Discharge Unit (BCDU), Plasma Contactor Unit (PCU). The keel deck consists of an Ammonia Tank Assembly (ATA), Nitrogen Tank Assembly (NTA), and a Pump Module (PM).

ELC-2: The top deck consists of a Control Moment Gyro (CMG), Cargo Transport Container (CTC), High Pressure Gas Tank-Oxygen (HPGT), and MISSE-7. The keel deck consists of the Trailing Umbilical System-Reel Assembly (TUS-RA), a Nitrogen Tank Assembly (NTA), and a Pump Module (PM).

The ELC-1 was installed on the nadir side (bottom) of the P3 truss and the ELC-2 was installed on the zenith (top) outer side of the S3 truss.

The EVA's on this mission involved placing other hardware on the ISS, such as moving the SASA antenna away from the payload bay into the Z1 truss as a spare part. The HPGT Oxygen tank was moved from ELC-2 to the Quest Airlock as the final location. New cables were placed on top of the Z1 truss preparing the way for a second SGANT antenna which will be brought on a future mission. Other tasks involved setting up antennaes on the exterior of the Columbus Module. Also the FPMU/VSSA was relocated to the P1 truss.

This papermodel is available via Paypal only. The details that helped design this model was obtained from NASA site and technical data from Robotics documentation.

Enjoy!

 

 

 

 

 

 

PAYLOADS
KU-band antenna (bay 1) Starboard
Remote manipulator Arm: port side
Orbiter Boom Sensor System (OBSS): Starboard
SASA antennae (bay 3) starboard
ELC-1 (bays 6-8)
ELC-2 (bays 10-12)

 

 

Download Files:

 

Orbiter file
atlamodif5.pdf (1.21 mb)
 
Payload
 
Available via Paypal from Download page 5
 

 

Payload Assembly Manual

(3.3 mb)

 

 

 

 

 

 

 

 

 

 

 

 

 

Payload bay landing configuration

 

ELC-1

Position of ELC-1 on P3 lower site

 

 

 

 

ELC-1 (lower pallet) and ESP-3 (upper pallet) on the P3 truss attachment points

 

 

ELC-2

 

 

 

Position of ELC-2 on S3 upper site

 

 

Post EVA configurations

 

 

Quest Airlock configuration with new HPGT Oxygen tank

Also note the new SASA antennae on Z1 truss

Note position of the Airlock module shields packed on the ESP-2 pallet


ISS configuration post STS-129

ESP-3 Relocation on Jan 25, 2010

 

 

ESP-3 is moved via the Mobile Transporter to its new location

Aft view of S3 truss

Aft view of S3 truss (different angle)

Aft view of P3 truss

Aft view of P3 truss (different angle)

 

 

 

 

 

ISS Starboard side

 

ISS Port side

 

ULF-3 patch source: www.spacefacts.de

 

© 2010 All Rights Reserved